The works involved the refurbishment and modernisation of a 3,266 sq.m. built area, including the rebuilding of the fire hydrants, the complete rebuilding of the electrical, thermal and plumbing installations, the complete replacement of the carpentry, the laying of a
The station is an above ground station, consisting of a building (15,100 sq.m built area) with basement, ground floor and two floors. At the same time, six pedestrian access areas are being built (two of which are located on the
Technical data of the work: primary, secondary and tertiary wastewaters processing, mud treatment, mud thickening and dehydration, decommissioning and demolition of former structures, station testing and maintenance Can serve over 125,800 inhabitants daily Execution duration: 26 months
5000sqm of rehabilitation; execution of stripping, consolidation and architecture – restoration works.
4,438 seats. main competition field, surrounded by grandstands for spectators and a training ground, located in the basement of the building, under the imprint of the main field, both courts having a handball playing area at official dimensions (20x40m), underground
Residential buildings phase 1; Project will continue: up to 1,041 apartments at the end; Built area of around 100,000 square meters. For details: www.arboresidence.ro