Detour variant of Sanmartin

Project completed: May 2024 The link road between the Municipality of Oradea and the Commune of Sânmartin is 5.75 km long, with a 2.27 km long link road to the DN76 and the locality of Haieu, and a 3 metre

Oradea Polyvalent Hall

5,300 spectators for sports competitions; 7,200 spectators for other events; main hall for sports competitions; training hall – with a playing surface made of solid beech parquet that can be dismantled for events; 6mm pixelpitch multimedia cube; 2 pixelpitch 10mm

Aquapark Toldi Salonta

The water park will cover 2.8 ha, will have an area of ​​over 10,000 square meters. The outdoor capacity of the aquapark will be 1,500 people and the indoor capacity of 300 people.

Craiova International Airport – Expansion and modernization

project includes the construction of a new passenger terminal with a constructed area of 12,791sqm, a new car park serving the entire airport, access roads, levelled runway apron surface, safety area, technology roads, taxiways, security control equipment and systems, as