Detour variant of Sanmartin

Bihor
  • Project completed: May 2024
  • The link road between the Municipality of Oradea and the Commune of Sânmartin is 5.75 km long, with a 2.27 km long link road to the DN76 and the locality of Haieu, and a 3 metre wide cycle track. The whole project consists of 2 bridges, 2 overpasses, 1 viaduct, 1 bicycle underpass, 11 bridges and 5 roundabouts.
Next project